After we run the radiant heat tubing, Renee staples the heat transfer plates to the underneath side of the floor. These hold the tubing in place and also help distribute the heat to the floor.
The tubing actually handles a lot more easily than it looks. Once we had a system we could run a 300' length through the joists in less than 20 minutes.